Verification & Packet Tracer Assembly Guide: PTL-0001

Assembly details and expected results for Dual-Stack IPv4 and IPv6 Static Routing. It shows the finished configuration, so use it to check your work.

Lab ID: PTL-0001
Lab Title: Dual-Stack IPv4 and IPv6 Static Routing
Category: routing
Difficulty: Intermediate


1. Physical & Packet Tracer Assembly Manifest#

Device Hardware & Module Schedule#

Device Role Device Label Packet Tracer Model Module Slots Software / IOS Version
Site A Router R1 Cisco ISR 4331 (or 2911) 3x GigabitEthernet onboard Cisco IOS XE 16.6.4 / IOS 15.x
Site B Router R2 Cisco ISR 4331 (or 2911) 3x GigabitEthernet onboard Cisco IOS XE 16.6.4 / IOS 15.x
Site A Switch S1 Cisco Catalyst 2960-24TT 24x 10/100, 2x Gigabit Cisco IOS 15.0(2)SE4 (LAN Base)
Site B Switch S2 Cisco Catalyst 2960-24TT 24x 10/100, 2x Gigabit Cisco IOS 15.0(2)SE4 (LAN Base)
Site A Workstation 0 PC0 PC-PT 1x FastEthernet Generic Host OS
Site A Workstation 1 PC1 PC-PT 1x FastEthernet Generic Host OS
Site B Workstation 2 PC2 PC-PT 1x FastEthernet Generic Host OS
Site B Workstation 3 PC3 PC-PT 1x FastEthernet Generic Host OS

Port-to-Port Cabling Matrix#

Origin Device Origin Port Destination Device Destination Port Network Segment Cable Type
R1 GigabitEthernet0/0/1 R2 GigabitEthernet0/0/0 WAN Transit (209.165.200.224/30) Copper Straight-Through / Auto-MDIX
R1 GigabitEthernet0/0/0 Switch S1 FastEthernet0/24 Site A LAN (192.168.10.0/24) Copper Straight-Through
Switch S1 FastEthernet0/1 PC0 FastEthernet0 Site A LAN Access (VLAN 1) Copper Straight-Through
Switch S1 FastEthernet0/2 PC1 FastEthernet0 Site A LAN Access (VLAN 1) Copper Straight-Through
R2 GigabitEthernet0/0/1 Switch S2 FastEthernet0/24 Site B LAN (10.1.1.0/24) Copper Straight-Through
Switch S2 FastEthernet0/1 PC2 FastEthernet0 Site B LAN Access (VLAN 1) Copper Straight-Through
Switch S2 FastEthernet0/2 PC3 FastEthernet0 Site B LAN Access (VLAN 1) Copper Straight-Through

Addressing Table#

Device Interface IPv4 Address Subnet Mask IPv6 Global Address Default Gateway
R1 Gi0/0/0 192.168.10.10 255.255.255.0 2001:db8:acad:10::10/64 N/A
R1 Gi0/0/1 209.165.200.225 255.255.255.252 2001:db8:feed:224::1/64 N/A
R2 Gi0/0/0 209.165.200.226 255.255.255.252 2001:db8:feed:224::2/64 N/A
R2 Gi0/0/1 10.1.1.10 255.255.255.0 2001:db8:cafe:1::10/64 N/A
S1 VLAN 1 192.168.10.1 255.255.255.0 N/A (Management) 192.168.10.10
S2 VLAN 1 10.1.1.1 255.255.255.0 N/A (Management) 10.1.1.10
PC0 Fa0 192.168.10.2 255.255.255.0 2001:db8:acad:10::2/64 192.168.10.10 / 2001:db8:acad:10::10
PC1 Fa0 192.168.10.3 255.255.255.0 2001:db8:acad:10::3/64 192.168.10.10 / 2001:db8:acad:10::10
PC2 Fa0 10.1.1.2 255.255.255.0 2001:db8:cafe:1::2/64 10.1.1.10 / 2001:db8:cafe:1::10
PC3 Fa0 10.1.1.3 255.255.255.0 2001:db8:cafe:1::3/64 10.1.1.10 / 2001:db8:cafe:1::10

2. Pre-Configuration & Topology Asset Preservation#

  • Preserved Contributor Binary Asset: dual-stack-static-routing.pkt (SHA-256: 8d7f62a8b4e36ef0a6efb613b92e84dbed3f1c34cb5d268b9d2b7db487680b31) represents the verified working reference solution.
  • Complete device configuration files:

3. Positive Verification Tests#

Test POS-01: Static Route Table Installation#

  • Action: At R1#, issue show ip route static and show ipv6 route static.
  • Expected Terminal Output:
    R1# show ip route static
    S     10.1.1.0/24 [1/0] via 209.165.200.226
    
    R1# show ipv6 route static
    S   2001:DB8:CAFE:1::/64 [1/0]
         via 2001:DB8:FEED:224::2
    
  • Criterion: Static routes to remote LAN are installed with Administrative Distance of 1 ([1/0]) via the correct R2 WAN next hop.

Test POS-02: End-to-End IPv4 Routing Reachability#

  • Action: From PC0 (192.168.10.2), ping PC2 (10.1.1.2).
  • Expected Terminal Output:
    PC0> ping 10.1.1.2
    Pinging 10.1.1.2 with 32 bytes of data:
    
    Reply from 10.1.1.2: bytes=32 time=5ms TTL=126
    Reply from 10.1.1.2: bytes=32 time=5ms TTL=126
    Reply from 10.1.1.2: bytes=32 time=5ms TTL=126
    Reply from 10.1.1.2: bytes=32 time=6ms TTL=126
    
    Ping statistics for 10.1.1.2:
        Packets: Sent = 4, Received = 4, Lost = 0 (0% loss)
    
  • Criterion: 100% ICMP packet success across two router hops (TTL decremented by 2).

Test POS-03: End-to-End IPv6 Routing Reachability#

  • Action: From PC0, ping PC2 IPv6 address: ping 2001:db8:cafe:1::2.
  • Expected Terminal Output:
    PC0> ping 2001:db8:cafe:1::2
    Pinging 2001:db8:cafe:1::2 with 32 bytes of data:
    
    Reply from 2001:db8:cafe:1::2: bytes=32 time=5ms TTL=126
    Reply from 2001:db8:cafe:1::2: bytes=32 time=5ms TTL=126
    Reply from 2001:db8:cafe:1::2: bytes=32 time=5ms TTL=126
    Reply from 2001:db8:cafe:1::2: bytes=32 time=6ms TTL=126
    
    Ping statistics for 2001:db8:cafe:1::2:
        Packets: Sent = 4, Received = 4, Lost = 0 (0% loss)
    
  • Criterion: 100% IPv6 packet success across the dual-stack transit WAN link.

4. Negative Verification Tests#

Test NEG-01: Asymmetric Routing / Missing Return Route#

  • Action: On R2, remove the IPv4 return route: no ip route 192.168.10.0 255.255.255.0 209.165.200.225. From PC0, ping PC2 (10.1.1.2).
  • Expected Terminal Output:
    PC0> ping 10.1.1.2
    Pinging 10.1.1.2 with 32 bytes of data:
    
    Reply from 192.168.10.10: Destination host unreachable.
    Reply from 192.168.10.10: Destination host unreachable.
    Reply from 192.168.10.10: Destination host unreachable.
    Reply from 192.168.10.10: Destination host unreachable.
    
    Ping statistics for 10.1.1.2:
        Packets: Sent = 4, Received = 0, Lost = 4 (100% loss)
    
  • Criterion: R1 forwards the packet to R2, but R2 drops the return echo reply due to lack of a route back to 192.168.10.0/24. Proves that routing must be bidirectional.

Test NEG-02: Incorrect Next-Hop IP Address#

  • Action: Configure static route pointing to an unconfigured next-hop: ip route 10.1.1.0 255.255.255.0 209.165.200.230. Inspect show ip route.
  • Expected Behavior: Cisco IOS will not install the static route into the forwarding table because the next-hop address cannot be resolved via ARP on any connected subnet.

5. Diagnostic & Troubleshooting Reference#

Symptom Root Cause Remediation Command
Ping from PC0 to R1 succeeds, but to PC2 fails Missing static route on R1 or missing return route on R2 Check show ip route static on both routers; ensure both directions are configured.
IPv4 works, but IPv6 fails completely ipv6 unicast-routing omitted on R1 or R2 Execute ipv6 unicast-routing in global configuration mode on both routers.
Router-to-router WAN ping fails Subnet mask mismatch on /30 point-to-point link Ensure both ends use 255.255.255.252.

This page is generated from labs/routing/dual-stack-static-routing/verification.md in the repository. Corrections go there.

Search

Type at least two letters, for example OSPF, DHCP relay or VLAN.