Verification and Acceptance Matrix — PTL-0044

Assembly details and expected results for VLAN Trunk Allowed-List Troubleshooting. It shows the finished configuration, so use it to check your work.

Lab ID: PTL-0044
Title: VLAN Trunk Allowed-List Troubleshooting
Status: TESTED_PASS (Verified live in Cisco Packet Tracer 9.0.1 via MCP loopback bridge automation)


1. Packet Tracer Topology Construction Manifest#

To construct or manually verify this topology in Cisco Packet Tracer:

Device Inventory#

Device Role PT Device Model Display Name Modules / Slots
Distribution Switch 1 Cisco Catalyst 2960-24TT SW-1 24 FastEthernet + 2 GigabitEthernet ports
Distribution Switch 2 Cisco Catalyst 2960-24TT SW-2 24 FastEthernet + 2 GigabitEthernet ports
Engineering Workstation 1 PC-PT PC-Eng1 FastEthernet0 (192.168.10.10/24, VLAN 10)
Marketing Workstation 1 PC-PT PC-Mkt1 FastEthernet0 (192.168.20.10/24, VLAN 20)
Operations Workstation 1 PC-PT PC-Ops1 FastEthernet0 (192.168.30.10/24, VLAN 30)
Engineering Workstation 2 PC-PT PC-Eng2 FastEthernet0 (192.168.10.20/24, VLAN 10)
Marketing Workstation 2 PC-PT PC-Mkt2 FastEthernet0 (192.168.20.20/24, VLAN 20)
Operations Workstation 2 PC-PT PC-Ops2 FastEthernet0 (192.168.30.20/24, VLAN 30)

Physical Cabling Matrix#

Link ID Source Device Source Port Destination Device Destination Port Cable Type
L-01 SW-1 GigabitEthernet0/1 SW-2 GigabitEthernet0/1 Copper Crossover
L-02 SW-1 FastEthernet0/10 PC-Eng1 FastEthernet0 Copper Straight-Through
L-03 SW-1 FastEthernet0/20 PC-Mkt1 FastEthernet0 Copper Straight-Through
L-04 SW-1 FastEthernet0/15 PC-Ops1 FastEthernet0 Copper Straight-Through
L-05 SW-2 FastEthernet0/10 PC-Eng2 FastEthernet0 Copper Straight-Through
L-06 SW-2 FastEthernet0/20 PC-Mkt2 FastEthernet0 Copper Straight-Through
L-07 SW-2 FastEthernet0/15 PC-Ops2 FastEthernet0 Copper Straight-Through

2. Positive Verification Test Matrix#

Test ID Objective Command / Procedure Expected Result Pass Criteria
POS-01 Inter-Switch Trunk Operational Mode SW-1# show interfaces GigabitEthernet0/1 switchport
SW-2# show interfaces GigabitEthernet0/1 switchport
Both switches display Administrative Mode: trunk and Operational Mode: trunk. Negotiation of Trunking is Off. Trunk link statically established and operational
POS-02 Native VLAN Alignment SW-1# show interfaces trunk
SW-2# show interfaces trunk
Both switches show Native VLAN 99 on GigabitEthernet0/1. Native VLANs match; no VLAN leakage or CDP mismatch warnings
POS-03 Allowed VLAN List Consistency SW-1# show interfaces trunk
SW-2# show interfaces trunk
Both switches show 10,20,30,99 under Vlans allowed on trunk. All intended corporate VLANs allowed across trunk
POS-04 VLAN 10 (Engineering) Reachability PC-Eng1> ping 192.168.10.20 4/4 echo replies received with 0% packet loss. Intra-VLAN 10 communication functioning across trunk
POS-05 VLAN 20 (Marketing) Reachability PC-Mkt1> ping 192.168.20.20 4/4 echo replies received with 0% packet loss. Intra-VLAN 20 communication functioning across trunk
POS-06 VLAN 30 (Operations) Reachability PC-Ops1> ping 192.168.30.20 4/4 echo replies received with 0% packet loss. Intra-VLAN 30 communication restored across trunk
POS-07 Layer 2 Inter-VLAN Isolation PC-Eng1> ping 192.168.20.10 Request timed out (100% loss). Proper Layer 2 broadcast domain segmentation maintained

3. Negative & Fault Tolerance Test Matrix#

Test ID Fault Scenario Injection Procedure Observed Symptom Recovery Procedure
NEG-01 Starter State: Pruned VLAN 30 In starter topology, test ping from PC-Ops1 to PC-Ops2 (ping 192.168.30.20). Returns Request timed out (100% loss). VLAN 30 frames are pruned at SW-1's trunk port. Execute interface GigabitEthernet0/1 and switchport trunk allowed vlan add 30 on SW-1.
NEG-02 Starter State Fault Identification On SW-1 and SW-2, run show interfaces trunk and show interfaces switchport. SW-1 allows only 10,20,99 (VLAN 30 omitted). SW-2 trunk is configured with Native VLAN 1 instead of 99. Align Native VLAN on SW-2 with switchport trunk native vlan 99 and add VLAN 30 to SW-1 trunk allowed list.

4. Reload and Persistence Verification#

  • completed.pkt reloaded cleanly via ipc.appWindow().fileOpen().
  • Switches SW-1 and SW-2 preserved startup configurations from NVRAM across reload.
  • Full intra-VLAN reachability across all three VLANs confirmed after reload.
  • Reopened starter.pkt cleanly and confirmed initial faulted state is intact for learner exercise.

This page is generated from labs/switching/vlan-trunk-allowed-list-troubleshooting/verification.md in the repository. Corrections go there.

Search

Type at least two letters, for example OSPF, DHCP relay or VLAN.